Client:

Cobar Regional Council

Location:

Cobar, NSW

Overview:

Beck Water was engaged by Cobar Regional Council to deliver a complete design, supply, and construction solution for a dam transfer pump system. The project was critical to improving water reliability and distribution capacity within the Cobar water network.

Beck Water was responsible for the end-to-end delivery of the dam transfer system, including:

  • Design of the intake pump station, discharge pipeline, and associated civil, mechanical, and electrical components.
  • Selection and supply of pumps, valves, fittings, and controls to meet the required flow and head conditions.
  • Construction and installation of the pump station and discharge line in compliance with Council specifications and relevant Australian Standards.
  • Testing and commissioning to confirm hydraulic performance and ensure seamless integration with the existing water network.
Highlights:
  • Reliable and efficient water transfer from the dam to the Cobar water supply network.
  • Improved operational control and water management capability.
  • A compliant design aligned with Council and regulatory standards.
  • A robust, maintainable solution with long-term serviceability and performance.